For general contractors

Grady calls every sub, so your PMs don't have to.

Grady is a voice assistant that texts and calls your subcontractors. It confirms the week ahead on Sunday, then checks every weekday morning that today's crews are actually on their way. Your PMs get back the two to three hours a day they spend chasing subs.

This is what a Grady call sounds like →

MT
Mike Torres
Torres Electric · Maple Street Lofts
On call
75% of a PM's calls are subs calling them. Grady flips it. One no-show can blow up a week's schedule. Grady catches it Sunday. 6:30 AM check-ins, done before your PMs pour coffee.

Monday morning, already sorted.

This is what your PM opens at 7 AM: every sub texted and called over the weekend, every answer already on the board. The dashboard only asks for attention where a human is actually needed.

Today
Monday · 14 subs scheduled
2 need attention
0Confirmed
0Delayed
0Conflict
0No response
RC
Rodriguez Concrete
Slab pour · Riverside Commons
Confirmed
TE
Torres Electric
Rough-in · Maple Street Lofts
8:00 ETA
PP
Precision Plumbing
Top-out · Oakwood Medical
Conflict
SD
Summit Drywall
Hang & tape · Harborview
No response
AH
Apex HVAC
Ductwork · Riverside Commons
Confirmed
Activity
Sunday evening · weekly confirmations
18 calls made
📞

Torres Electric confirmed Mon–Wed, running about an hour late Monday. Schedule updated, PM notified.Call · 1 min 12 sec · 3:04 PM

📞

Precision Plumbing can't make Monday: inspection slipped at another site. Flagged as a conflict with the reason attached.Call · 58 sec · 3:11 PM

💬

Summit Drywall texted back: "make it wed not tues". Wednesday it is; the schedule and the PM both know.Text · 4:47 PM

📞

Apex HVAC didn't answer at 3 PM. Grady left a voicemail, texted a summary, and got them on the 6 PM retry: confirmed.Call · retry · 6:02 PM

🎤

Field note from the Rodriguez crew lead: "pump truck showed at 6:45, pour started on time." Transcribed and pinned to Riverside Commons.Voice note · 7:18 AM

Ask Grady
Thursday · 2:30 PM

Got it. 3 subs on Friday's schedule haven't confirmed. Calling them now.Grady · just now

📞

Summit Drywall answered: confirmed for Friday, 7 AM.Call 1 of 3 · 41 sec

📞

Ironline Steel answered: crew is on, asked about gate access. Question routed to you.Call 2 of 3 · 1 min 05 sec

🕑

GreenScape didn't pick up. Voicemail left, text sent, retry queued for 4 PM.Call 3 of 3

Open the demo full screen

See it yourself

Drive the actual app, right here.

This is the same dashboard your PMs would open every morning, running on sample data. No sign-up, nothing to install.

  • A realistic week: projects, subs, and every schedule status Grady tracks.
  • See how confirmed crews stay quiet and problems rise to the top.
  • Open a sub's profile and follow a call from dial to dashboard.

Rather talk to a human?

Fifteen minutes with the founder, straight answers.

Book a demo

A week with Grady

Set the schedule. Grady runs the loop that keeps it true.

Sunday
noon

The week goes out by text

Every sub on every project gets next week's schedule, personalized to their days and tasks. Snap a photo of your schedule or dictate it; Grady reads it in and you approve before anything sends.

Sunday
afternoon

Grady calls to confirm the week

A real conversation with every sub. "Yep" is confirmed. "Tuesday not Monday" updates the schedule. "Can't make it" becomes a red flag with the reason attached. No-answers get a voicemail and a text, then a retry that evening.

Mon–Fri
6:30 AM

Morning check-ins

Grady calls everyone scheduled for today and confirms they're on their way. Your PM knows about the crew that isn't coming at 6:45, not when the super calls from an empty site at 8.

All
day

The site talks back

Subs text changes and Grady understands them. Field crews call Grady's number with updates from the job; they're transcribed and logged to the right project. PMs fire off voice commands like "call everyone who hasn't confirmed yet."

Weekly

Clients stay in the loop

Grady drafts project summary emails from what actually happened on the phones and in the field notes. Your PM reviews and sends. Sub reliability builds up over time, so you know who to trust with the critical path.

Every other tool watches.
Grady picks up the phone.

Construction software holds the plan or records the chaos after it happens. None of it gets a sub to say "I'll be there Monday" out loud.

The rest of your stack

  • 📋Scheduling tools hold the plan and wait for someone to update it
  • 📁Document platforms file the RFIs and drawings
  • 📡Call recorders document the fire after it starts
  • 📧Mass texts blast out and nobody knows who actually read them

Grady

  • 📞Makes the outbound calls, with a voice subs actually talk to
  • ✍️Turns every answer into a schedule update, not a note to self
  • 🚨Flags delays and conflicts days early, with the reason attached
  • 📈Builds a reliability record on every sub, from real behavior

Construction runs on phone calls. That hasn't changed in fifty years, and it isn't going to. Grady just makes them for you.

Subs opt in first

No sub gets a single call or text until they've said yes by text. Grady introduces itself on every call and says the call may be recorded.

Stop means stop

A sub who texts STOP, or says it on a call, is done being contacted. Everywhere, immediately, across calls and texts.

Humans stay in charge

Grady proposes; your PM approves. Schedule changes and client emails get a human yes before they happen.

See Grady on one of your projects.

Fifteen minutes on your schedule and a straight answer on whether this fits your operation. If it doesn't, we'll tell you.

Book a demo

Built for GCs with real sub coordination pain: PMs running multiple projects and dozens of subs.